Control and Backup Control Observation

Post Reply
Newcastlescan
Posts: 14
Joined: Thu Aug 14, 2008 6:11 pm

Control and Backup Control Observation

Post by Newcastlescan » Mon Sep 01, 2008 9:18 am

Howdy all

I observe in unitrunker site 14 Lambton, has 2 Backup control channels, and thought they were used as voice channels when not operating as control channels. But they dont seem to be carrying any voice traffic at all, except for some testing the techs did last week, anyone observe similar operation on other sites
Cheers
Mike
Image

PS I uncheck the control channel and it just rechecks itself
Scanning with all ears

citabria
Site Admin
Posts: 1064
Joined: Thu Aug 14, 2008 8:22 pm

Re: Control and Backup Control Observation

Post by citabria » Mon Sep 01, 2008 12:19 pm

Yep, on GPT.

and I must say, the orange background is... interesting!

Cheers
citabria

system_tech
Posts: 263
Joined: Mon Aug 18, 2008 5:28 pm

Re: Control and Backup Control Observation

Post by system_tech » Mon Sep 01, 2008 4:37 pm

Back up control channels only carry voice if all other voice channels are simultaneously in use.

In this way they are least likely to be caught out carrying voice if immediately needed as control channel.

Its unusual to have 2 back up control channels but is done often when testsing. I understand that its the season for 6 monthly checks.

Post Reply